Higher Efficiency through High-tech Production Process and Better Customer Reliability & Satisfaction

Having produced only the best-quality automatic transmissions, the Hyundai Powertech’s production facilities have capitalized on maximizing the efficiency & productivity through some key success factors(i.e. 95%-automated equipment, unmanned logistics system, eco-friendly production process, etc.). This is why the Company has been able to manufacture such high-quality & high-efficiency multi-speed transmissions. Furthermore, the Company obtained the ISO/TS 16949 & ISO 14001 certificates, hence proving its technical competitiveness.

Video Overview

  • Die cast
  • Housing
  • Sheet-metal Forming
  • Gear Machining
  • Heat Treatment
  • Assembly
  • Testing/Shipping

It is the process of mold-casting those molten aluminum into automatic transmissions’ cases.

01.Molten Metal Supply : Supply of molten(700℃) aluminum into casting heater. 02.Die casting : Injection of melted alloy at high-speed/high-pressure into a precise mold and quick cooling/hardening → Well-surfaced high-precision mass-production. 03.Flow Hole Cutting : Cutting of a flow hole after the casting process. 04.AGV Conveyance : Unmanned automated conveyance of automatic-transmission cases to post-processing lines with AGV*. *AGV(Automatic Guided Vehicle) : Automated Guided Vehicle

interview video

Video Overview

It is the process of fabricating those automatic-transmission part cases & the torque converter housings as per their dimensions & shapes.

01. Finishing Machine : Cutting of undesirable parts(i.e. hole, etc.) during the assembly of an automatic-transmission case.  02.Leak Test : Oil-leakage check on an inner case with a leak tester → OK/NG. 03.Finishing Inspection : Visual Inspection on an inner/outer case for perfact quality → Inspection on & repair of find chips & defects

Interview Video

Video Overview

It is the process of forming, welding & machining those parts covering a planetary gear as per their dimensions & shapes.

01.Material Supply : Supply of those pre-welding & post-forming parts. 02.Welding : Welding of two different materials through E.B.W* . 03.Processing : Securing] of the concentricity/location(i.e. lathe processing, grinding, etc.) * E.B.W (Electronic Beam Welding) : Instant melting of welds at high-energy

Interview Video

Video Overview

It is the process of machining those power-transmission gears with steel materials.

01.Supply of Materials : Materials to be cut into gears are supplied by robot > 02.Hobbing : Gear Teeth* are produced by rotating both the HOB cutter and gear material against each other while gradually moving the cutter upwards > 03.Heat Treatment : Materials  are strengthened by performing phase transformation, diffusing atoms and re-casting metals or alloys in a combination of hot and cold for the purpose of giving the product better strength, rigidity, abrasion and shock resistance qualities > 04.Grinding : Gear teeth are finished by performing rotating/straight grinding using the grinding wheel	* Gear Teeth: The shape of the teeth cut into the gear

Interview Video

Video Overview

It is the process of heat-treating those power-transmission gears with steel materials.

01.Degreasing : Prevents the formation of a layer of surface oil and soot on the surface of the gears during Carburizing Heat Treatment* by moving cutting oil used in the manufacturing process > 02.Pre-Heating : Pre-heats materials to 900℃ before the carburizing process
							> 03.Carburizing : Injects active carbon into the material’s surface at a high temperature to achieve a higher level of rigidity and maintain internal properties > 04.Diffusion : Strengthens the rigidity demanded by the gear surface by diffusing carbon at a fixed distance across the surface of the material
							05.Hardening : Corrects the cold start hardening temperature   //   * Carburizing Heat Treatment : A method used to acquire mechanical properties (strong and non-breakable) by giving strength to the 
							exterior whilst keeping the interior soft by injecting carbon into the surface of low-carbon steel only.

Interview Video

Video Overview

It is a final production process(sub-line, main line, test line) based on certain particular assembly standards.

01.Sub Assembly : Production of inner automatic-transmission parts and their performance & function tests → Production of finished goods. 02.Main Supply : Conveyance of a specific volume of sub-assembly components to a main conveyor. 03.Main Assembly : Assembly & housing docking of sub-assembly parts with some equipment(i.e. press, coupler, robot, etc.). 05.Test Assembly : Assembly & washing of brackets with certain factors(i.e. engine matching, vehicle’s spatial efficiency, etc.) taken into consideration

Interview Video

Video Overview

It is the process involved in quality inspection and shipping of finished products.

01.Oil Pressure Test : Oil pressure check for each gear-shifting mode. 02.Noise Test : Shifting noise assessment for each gear-shifting mode(inclusive of gear errors and others). 03.Shipping : Loading of finished automatic transmissions onto pallets and their delivery to a automotive manufacturing plant according to a certain shipping plan

Interview Video

Video Overview

OPEN CLOSE
TOP
  • Facebook The Tale of Hyundai Powertech
  • YouTube - Hyundai Powertech Youtube channel
  • Production Process - Hyundai Powertech's Production Process of the Best Quality
  • PR Gallery Hyundai Powertech, its Dream Technology & its Dreamy Future
  • CSR Gallery Care for Society & Commitment to Better World
  • Customer Open-minded Customer Service with No Bias
  • Visit Reservation Hyundai Powertech Visit Reservation System